Office #3104 – 31st Floor, 1Lake Plaza, Cluster T, JLT(Jumairah Lake Towers), Dubai, United Arab Emirates

9:00- 17:00 Monday to Friday

+971-55-177-5734

Digital & Technology / DX & BPR

DX & BPR
Redesign the process before you implement the system

Biz Easy supports business process reengineering (BPR) and digital transformation for companies operating in the Middle East and Africa, from process mapping and redesign to system requirements and lasting adoption. Our principle is simple: DX without BPR fails. We build systems people keep using, with internal controls and access rights designed in from the start.

  • Process mapping
  • To-Be design
  • Approval workflows
  • SOPs
  • Change management
  • KPI design
Scope
Process, organisation, systemsIncluding internal control and access rights
Phase
Design → build → adoptionSupport at every stage
Duration
From 4–8 weeksSingle department, 1–2 processes
Region
UAE, KSA, GCC & AfricaDesigned for local requirements

01 — Summary

What is BPR? The step that makes DX succeed

In short: business process reengineering (BPR) means rethinking workflows, roles and approval rules from scratch and redesigning them. If DX uses technology to change how a business works, BPR is the step that decides what that change should be.

In the Middle East, ERP and SaaS rollouts often fail to take hold. The cause is usually the process design, not the system. Biz Easy treats BPR as the foundation of DX and stays involved through to adoption, rather than stopping at design or go-live.

02 — Why DX fails

Why DX projects fail in the Middle East

01

Implementing without process design

Moving today’s processes straight into a new system carries over inefficiency, reliance on individuals and internal control gaps.

02

Local requirements left out

UAE VAT, WPS and Emiratisation requirements are missed in configuration and have to be fixed after go-live.

03

No adoption on the ground

The system is configured, but teams do not understand how to use it and drift back to Excel and email.

03 — Scope

Eight areas our BPR work covers

01

Process mapping

We map current processes (As-Is) in BPMN and identify duplication, bottlenecks, manual work and risk points.

02

Target process design (To-Be)

We define, from scratch, what can be automated, standardised and digitised.

03

Approval workflows and access rights

We design approval rules and an access-rights matrix by role, department and risk level, with internal control and fraud prevention built in.

04

Organisation and roles

We review responsibilities and job descriptions and align them with Emiratisation positions.

05

Aligning process, system and controls

We map workflows to ERP configuration, approval workflows and audit trails.

06

Standard operating procedures (SOPs)

We produce SOPs that also work as handover material for new joiners and internal transfers.

07

Change management

We plan training, internal communication and follow-up so new ways of working stick.

08

KPIs and monitoring

We define KPIs to measure impact and link them to ERP dashboards and regular reports.

04 — Process

Our approach: BPR → DX → adoption

  1. 01

    Kick-off and scope

    We confirm the processes, organisation, timeline and target KPIs in scope, and interview key stakeholders to prioritise issues.

  2. 02

    Current-state analysis (As-Is)

    We document current processes and use interviews and observation to identify inefficiency, duplication and risk, including gaps between how managers and teams see the work.

  3. 03

    Target design (To-Be)

    We design workflows, approval rules and access rights in line with regulation, internal control and automation goals, and agree them with stakeholders, with alternative options where useful.

  4. 04

    Translating design into system requirements

    We convert the target design into ERP configuration specs, workflows, data fields and report requirements.

  5. 05

    Implementation and configuration

    Biz Easy configures Zoho and Odoo in-house, and manages other vendors as PMO. SOPs and manuals are prepared in parallel.

  6. 06

    Testing, training and adoption

    User testing, role-based training and post-go-live follow-up prevent a drift back to Excel. We check adoption one, three and six months after go-live.

05 — Duration

Typical duration

ScopeTypical durationMain deliverables
Single department, 1–2 processes4–8 weeksProcess maps (As-Is / To-Be), approval rules, SOPs
Company-wide (several departments and processes)12–24 weeksCompany-wide process maps, access-rights matrix, system requirements, KPI design, full SOP set

BPR can run alongside an ERP implementation. For ERP comparison and selection, see IT & ERP Implementation; to implement on Zoho, see Zoho Implementation.

06 — FAQ

Frequently asked questions about DX and BPR

What is the difference between BPR and DX?

BPR redesigns workflows, roles and approval rules from scratch; DX uses digital technology to change how the business operates. Deciding what to change through BPR first, then building it into systems through DX, makes adoption far more likely.

Can we engage you for BPR only, without a system implementation?

Yes. We can deliver process mapping, redesign and SOPs on their own. Implementation can then go to another vendor or continue with Biz Easy.

Our ERP is already live but nobody uses it properly. Can you help?

Yes. We start by diagnosing why adoption has stalled, then redesign processes, correct configuration and retrain users.

How long does BPR take?

As a guide, a single department with one or two processes takes 4–8 weeks, and a company-wide programme across several departments takes 12–24 weeks. BPR can run alongside an ERP implementation.

Can BPR be combined with strengthening internal controls?

Yes. We build internal control and fraud prevention into approval workflows and access rights. Where internal control is the main focus, we work together with our Risk Consulting & Internal Control team.

Contact

DX that lasts starts with process design

If your ERP is live but underused, we can start by working out why, together.

This website uses cookies and asks your personal data to enhance your browsing experience. We are committed to protecting your privacy and ensuring your data is handled in compliance with the General Data Protection Regulation (GDPR).